pk dhakad
17 posts
TimePosted 02/08/2012 10:18:34
pk dhakad says

re cement transport problem through belt

Dear mr. Arman

The back spillage of cement may occure while discharging through chute to belt conveyor to avoid this pl. check the chute if chute is discharging material vertically over belt in that case material may rush in all directions. so chute should be inclined enough (45 to 55 deg ) to belt and have some horizontal lip.Besides this use modular skirt system in chute. hope this may solve ur. problem

Reply


Know the answer to this question? Join the community and register for a free guest account to post a reply.