Poland: Cementownia Warta S.A. places repeat order with GEBR. PFEIFFER AG

Poland: Cementownia Warta S.A. places repeat order with GEBR. PFEIFFER AG
21 December 2007


At the end of June 2007 GEBR. PFEIFFER AG received an order from Cementownia Warta S.A. to supply a cement raw mill. This recent order is a repeat order of the MPS 4000 B vertical roller mill supplied in 1999. The mill type chosen for the required cement raw meal capacity of 240 t/h at a fineness of 12 % R 0.090 mm is again an MPS 4000 B. Compared to the mill in operation, which is fitted with a 1,250-kW drive and producing the same capacity, this mill will come equipped with a 1,600-kW drive due to a poorer grindability being expected for the future cement raw material. Published under Cement News