Raw materials Question 10
NOx control approaches applicable to the cement industry may be grouped in three categories: process modifications, combustion control, and NOx reduction controls. One process modification that can be quantified is the CemStar process, which is a small addition of steel slag to the raw kiln feed. Can you provide more information on CemStar?
|
|
-
08-22-2006, 10:21 |
-
08-22-2006, 10:21 |
-
admin
-
-
-
Joined on 08-22-2006
-
-
Posts 1,162
-
-
|
Raw materials Question 11
NOx control approaches applicable to the cement industry may be grouped in three categories: process modifications, combustion control, and NOx reduction controls. One process modification that can be quantified is the CemStar process, which is a small addition of steel slag to the raw kiln feed. Can you provide more information on CemStar?
|
|
-
08-22-2006, 10:21 |
-
08-22-2006, 10:21 |
-
admin
-
-
-
Joined on 08-22-2006
-
-
Posts 1,162
-
-
|
Raw materials Question 12
Please advise us that is it possible to use the combination of Ca(OH)2 and CO2 and waste of molasses (in sugar and lump sugar factories) for correction of raw material, instead of CaCO3?
|
|
-
08-22-2006, 10:21 |
-
08-22-2006, 10:21 |
-
admin
-
-
-
Joined on 08-22-2006
-
-
Posts 1,162
-
-
|
Raw materials Question 13
I need to know how and why companies use air cooled blast furnace slag in the manufacture of cement.
|
|
-
08-22-2006, 10:21 |
-
08-22-2006, 10:21 |
-
admin
-
-
-
Joined on 08-22-2006
-
-
Posts 1,162
-
-
|
Raw materials Question 14
Could you please to explain the possibility of steel slag in cement industry as raw material if it was added in the kiln inlet ?
|
|
-
08-22-2006, 10:21 |
-
08-22-2006, 10:21 |
-
admin
-
-
-
Joined on 08-22-2006
-
-
Posts 1,162
-
-
|
Raw materials Question 15
We have a problem related with high sand usage to make the consistent raw material mix. Sand addition for silica correction is roughly five per cent into raw material results roughly three per cent quartz content in the raw meal over 45 micron residue. Consequently the overall effect is frequent free lime formation in the clinker due to high quartz content in the raw meal, negatively effecting quality and high heat consumption in burning. In order to tackle with the problem following activities are already done
1. The burner pipe is replaced by a new design burner pipe with high momentum to improve burning and have stronger flame.
2. New coal dosing system is installed to have stable and accurate kiln fuel feed. Also with this system, we started to grind petcoke and other types of coal separately to facilitate burning. However the problem still persists.
|
|
-