6 posts
18 posts
2 posts
TimePosted
02/06/2021 11:45:11
Sandy
says
re How to install upright retaining ring
Kiln retainer ring erection procedure will differ with different OEM
- Normally supplied in segment usually 6 segment.
- Keeping a gap of min 10mm between retainer ring segment.
- Height of retainer ring should be minimum 40mm.
- Single V groove normally recommended on retainer segment & flushed welding on brick side.
if you have any further doubt, please let us know.
Page
1
of
1
1