Cement production reached 1.288Mt in 2010 and was 0.6% down in comparison with 1.28Mt were produced in 2009 and, in turn, were 19.7% down from 2008.
Garadagh Cement JSC is the principal cement producer in Azerbaijan with the a capacity of 1-1.4Mt, enough to meet 50 per cent of the annual demand.