The plant would have capacity to manufacture 6,000tpd of Portland Pozzolona cement. The plant would require 4000-4500tpd of clinker, 1350-1900t fly ash and 280- 350t gypsum daily which would be sourced from UltraTech units at Hirmi and Rawan in Chhattisgarh and Tadpatri in Andhra Pradesh. Power would be sourced from the West Bengal State Electricity Distribution Co Ltd.
Handpicked stories, in your inbox
Our editors pick the top news delivered to your inbox. Sign-up today!