Plant construction of the PT Semen Andalas works in Banda Aceh started in 2006 and production began in July 2010, according to President Director of Lafarge Cement Indonesia (LCI) Marc Jarrault.
Prior to the tsumani, the plant was capable of producing 1.2Mta but production capacity has now been increased to 1.6Mta.