Dr Every joined the Boral board in September 2007 and was appointed deputy chairman in November 2009.
The plant, located about 250km south of Dar es Salaam, will have a capacity of 300,000t[a, he said.
Source: Bloomberg
Our editors pick the top news delivered to your inbox. Sign-up today!