The new greenfield plant will be situated in Chindonga close to Sumbe Town in the Kwansa Sul province 300 kilometres south of Angola’s capital Luanda. The project is a continuation of the collaboration FLSmidth currently has with this customer on a project in the United Arabic Emirates.
FLSmidth is to supply all machinery for the plant including three crushers, a raw material store, an ATOX raw mill, a three-support kiln with ILC five-string preheater and SF Cross Bar cooler, two UMS cement mills and a complete packaging plant with four lines provided by FLSmidth’s subsidiary Ventomatic.
The contract also includes a state-of-the-art QCX/Robolab quality control system and an ECS process control system supplied by FLSmidth Automation as well as a complete electrical equipment package and FLSmidth Airtech fabric filters.