The first line with daily capacity of 2500t will complete construction before the end of June 2008, while the second 5000tpd line will be ready for production before the end of 2009. By that time, the two lines will be able to produce 3Mta of clinker.
Previously, BBMG has acquired Luquan Dongfang Zenith Cement Co, Ltd, which is also based in Shijiazhuang, capital of Hebei Province. The combined production capacity of the two new lines and Luquan will reach 8.5Mt at 2009-end, the biggest in Shijiazhuang.