Batisöke Söke Çimento Sanayi TAS awarded KHD Humboldt Wedag a contract for engineering and delivery of equipment to increase its cement grinding capacity at its plant in western Turkey.
The contract to install a new COMFLEX® grinding system will increase the capacity of cement grinding unit No 5, from 59tph to 195tph at 3300Blaine and save more than 12kWh/t energy. KHD’s scope includes the engineering and delivery of mechanical and electrical equipment, as well as advisory services during erection and commissioning for the new COMFLEX SC16-3250.
The core equipment to be designed and delivered by KHD, as specified in this contract, includes:
Clinker grinding system/COMFLEX® SC16-3250
• Roller press RPS 16-170/180 with ROLCOX® system for control and monitoring
• V-Separator, type VS 524, as static classifier
• SEPMASTER high efficiency separator type SKS-VC 3250 as dynamic classifier
• HKF 200/265 system fan
This will be KHD’s third COMFLEX grinding unit to be installed in Turkey, following orders from Denizli and Kahramanmaras Cimento.
Handpicked stories, in your inbox
Our editors pick the top news delivered to your inbox. Sign-up today!