Bolivia’s FANCESA reported it finished constructing the base of the clinker silo at its new cement plant in Cal Orck’o.
The base is 45m in diameter and 2m thick and will serve as the foundation of a 35m-high structure. The construction was carried out by the cement plant’s staff and Concretec and required 70h of labour.

Dangote Cement reports 86% surge in profit after tax
In its unaudited results for the 1Q25, Dangote Cement posted a 21.7 per cent YoY increase in r...