Cement News tagged under: Sobradinho

RSS feed

Brazil: Schade provides raw material handling solution for Ciplan

08 May 2014, Published under Cement News

Schade has carried out an order for the Brazilian cement producer Ciplan Cimento Planalto S/A at its 1.6Mta Sobradinho plant which is due to start up later this year. Schade supplied a circular column equipped spreader with a flow rate of 1800tph (max 2000tph) and a 23m beam as well as a belt width of 1400mm. In addition, the scope of delivery includes a Schade bridge scraper equipped with a harrow covering the entire area of the stockpile’s profile. The bridge scraper can be operated with a...