amb
2 posts
TimePosted 04/10/2011 17:27:24
amb says

Re: Mono-Chamber Ball Mill

Please can i have the same data for , mono compartement ball raw mill with 35 rings 15 are lifters and the rest are classifiers (Diameters 5 and length 9)

, Also our maximum ball size is 90mm and lower is 40mm

also what is the best compensation while production is 210t/hr and wear rate is 65gm/ton

Reply


Know the answer to this question? Join the community and register for a free guest account to post a reply.

fjalali
81 posts
TimePosted 03/09/2012 08:43:15
fjalali says

re Re: Mono-Chamber Ball Mill

Please can i have the same data for , mono compartement ball raw mill with 35 rings 15 are lifters and the rest are classifiers (Diameters 5 and length 9): Designing it as a second chamber you will have:

Also our maximum ball size is 90mm and lower is 40mm:

90 mm 7.2%, 80 mm 7.5%, 70 mm 10.8%, 60 mm 16.4%, 50 mm 27%, 40 mm31.1% according to Bombled.

Also what is the best compensation while production is 210t/hr and wear rate is 65gm/ton:

Assuming 20 hour per day and 330 dys per year:

65 g/ton x 210 ton/day x 20 h/day x 330 day/year / 1000000 ton/g = 90.1 ton per year

with the composition of  90 mm 15%, 70 mm 35%, 50 mm 50% of the 90.1 ton ball

Hope it helps.

Reply