When US construction material supplier Ozinga needed a new terminal in the Port of Palm Beach it faced a range of challenges, including meeting not only its own requirements but also those of the local government in a tourist area. Through its novel design and construction, the project successfully addressed the concerns of an entire community. By FLSmidth Cement, USA
Rapid raw clay quality control in calcined clay cement production
Ensuring consistent quality of calcined clays used in cement production requires reliable monitor...