Avatar

Forum Moderator

Registered User

21MW Waste heat recovery system for Pukrang cement plant: Hakan Uvez, Asia Cement PLC (Thailand)

Filmed at Cemtech Asia 2015, 21-24 June, Grand Hyatt, Bangkok, Thailand

Challenges in developing a refuse-derived fuel for cement kilns in Southeast Asia from local waste: Brian McGrath, ResourceCo Asia (Singapore)

Filmed at Cemtech Asia 2015, 21-24 June, Grand Hyatt, Bangkok, Thailand

Successful AF systems for RDF, rice husks and shredded tyres: Luc Rieffel, Walter Materials Handling / ATS Group (France).

Filmed at Cemtech Asia 2015, 21-24 June, Grand Hyatt, Bangkok, Thailand

SCG’s Lampang plant: a role model for sustainable development in business operation: Poramen Pradaphon, Siam Cement Lampang (Thailand).

Filmed at Cemtech Asia 2015, 21-24 June, Grand Hyatt, Bangkok, Thailand

Myanmar emerges – cement market and project developments: Soe Naing, KBZ Industries (Myanmar)

Filmed at Cemtech Asia 2015, 21-24 June, Grand Hyatt, Bangkok, Thailand

Indian cement industry – present status and the way forward: Dr SK Handoo, Cement Manufacturers’ Association of India (India)

Filmed at Cemtech Asia 2015, 21-24 June, Grand Hyatt, Bangkok, Thailand

AdBri sees strong rise in half-year profit

Adelaide Brighton Ltd reported net profit after tax for the half year ended 30 June 2015 of AUD82.6m, an increase of...

Petron Engineering Construction receives order from Shree Cement, India

Petron Engineering Construction has received work order from Shree Cement in Bewar, Rajasthan, India. The order in...

PT Semen Tonasa operations unaffected by fire, Indonesia

PT Semen Tonasa cement plant remains in normal operation despite damage causd by a fire on Wednesday to one of its f...

JSW Group resumes plans for Bengal plant, India

The JSW Group has proposed to build a 2.5Mta slag-based cement plant in Salboni, Bengal. Should everything proceed a...

;